X hits on this document

PDF document

PRESALE INSPECTION AND BASIC MAINTENANCE - page 3 / 4

8 views

0 shares

0 downloads

0 comments

3 / 4

SUNROOF

Labor performed on this job:

Labor

3

Labor Rate:

$85.00

$255.00

Parts required on this job: GUIDE RAIL, LEFT SUNROOF 850, S/C70

Sunroof sluggish, diagnose and replace worn sunroof guide rails.

8

GUIDE RAIL, RIGHT SUNROOF 850, S/C70

BATTERY + CABLE

Labor performed on this job:

Labor

1.5

Labor Rate:

$85.00

$127.50

Inspection revealed poor electrical connection at fuse box lug. Remove and replace "B+" cable

Parts required on this job: CABLE, BATTERY POSITIVE AUX S/C70, V70 -00

8

SUSPENSION: UPPER SPRING SEAT RIGHT

Labor performed on this job:

Labor

1.2

Labor Rate:

$85.00

$102.00

Parts required on this job: SPRING SEAT, FOR STRUT

REMOVE RIGHT FRONT STRUT ASSEMBLY, DISASSEMBLE STRUT AND REPLACE UPPER SPRING SEAT. REASSEMBLE AND REINSTALL STRUT ASSEMBLY.

8

TURBO OIL RETURN TUBE

Labor performed on this job:

Labor

1

Labor Rate:

$85.00

$85.00

Parts required on this job: GASKET, TURBO OIL RETURN

Turbocharger oil return tube is leaking. Remove oil return tube, clean and reinstall using new gasket and o-ring seal.

8

SEAL RING, TURBO OIL RETURN PIPE

EMISSION TEST(FLEET)

Labor performed on this job:

Labor

0.1882

Labor Rate:

$85.00

$16.00

PERFORM BERNILILLO COUNTY EMISSION TEST 1

Page 3 of 4

Invoice: 29428 AUTO SHOPPE IMPORTS

14 1:01:57 PM 4/30/2008

Parts:

$542.60

Labor:

$255.00

Job Subtotal:

$797.60

1

$64.24

$64.24

1

$271.30

$271.30

1

$271.30

$271.30

Parts:

$64.24

Labor:

$127.50

Job Subtotal:

$191.74

1

$38.99

$38.99

Parts:

$4.02

Labor:

$85.00

Job Subtotal:

$89.02

1

$2.07

$2.07

1

$1.95

$1.95

Parts:

$38.99

Labor:

$102.00

Job Subtotal:

$140.99

Parts:

$0.00

Labor:

$16.00

Job Subtotal:

$16.00

Document info
Document views8
Page views8
Page last viewedSat Dec 03 10:26:36 UTC 2016
Pages4
Paragraphs247
Words703

Comments