X hits on this document

150 views

0 shares

0 downloads

0 comments

34 / 45

Composite `Doctor Blades’: Evaluation of Von Roll Isola Blades and Manufacturing Options, BTG Composites Inc., to Pacific Hoe International, December 2005.

PJS Hi-Kleen Composite FRP Underground Storage Tank (UST) Manual, Beckwith Technology Group LLC, to PJS Resources (PJS)/Johan Fibres Industry (JFI), October 2002 (available in CD- ROM PDF format).

Failure Investigation of Composite SCBA Cylinder ALT 797C, BTG Composites LLC, to Structural Composites Industries (SCI), January 16, 2002.

Seaport Project Composite Filament Wound Architectural Poles, BTG Composites LLC, to Lundberg Design PC, February 15, 2001.

Composite Tank Failure Investigation (with C. R. Hyland), Beckwith Technology Group, to Ingersoll-Rand Corporation, September 30, 1998.

Composite Preburner and Turbopump Housing Materials and Process (with B. A. Wilson), Wilson Composites Group, Inc., to USAF/AMC/ASC Wright Laboratory, June 1998.

Design Report on Filament Wound PJS Resources “Hi-Kleen Petrotank” Underground Storage Tank (UST) (with C. R. Hyland), Beckwith Technology Group, to PJS Resources, November 1997.

Failure Investigation Report: Air Starter Tank S/N 429 (with C. R. Hyland), Beckwith Technology Group, to EDO Fiber Science, January 1997.

Utilization of Advanced Composite Technology in Downstream Gas Industries (with C. R. Hyland), Beckwith Technology Group, to PJS Resources, September 1995.

Preliminary FE Analysis Input Report on Amalga 45-Gal Tank, Beckwith Technology Group, to Ingersoll-Rand Corporation, August 29, 1995.

Evaluation of EDO/Fiber Science Division Phoenix Engine Starting Systems Composite Tank Design, Process and Test Program, Beckwith Technology Group, to Ingersoll-Rand Corporation, August 16, 1995.

Final Report on “Failure of 45-Gal Phoenix Composite Tank”, Beckwith Technology Group, to Ingersoll-Rand Corporation, August 1, 1995.

Investigation of the Failure of a COMDYNE I CNG Fuel Cylinder, Beckwith Technology Group, to C3 International, February 1994.

Composite Riser Design Allowables (with C. R. Hyland), Beckwith Technology Group, to Westinghouse Electric Corporation, June 1993.

34

Document info
Document views150
Page views150
Page last viewedSat Jan 21 04:19:48 UTC 2017
Pages45
Paragraphs778
Words12260

Comments