X hits on this document

25 views

0 shares

0 downloads

0 comments

7 / 10

RSA KwaZulu Natal 2003

Situation analysis of the environmental impact of tsetse intervention operations in South Africa. Client International Atomic Energy Agency

Botswana 2002

Validation of Environmental Monitoring Programme in the Okavango Delta. Auditing and progress of the programme to assess the environmental impact of aerial tsetse control (pesticides) for the Botswana Government. Client DFID and Government of Botswana

Botswana 2000

Development of Environmental Assessment Programme for the Okavango Delta

Provision of technical assistance for the development of budgets and protocols for the environmental monitoring of tsetse control operations in the Okavango Delta (Ramsar Site).  Client: DFID and GoB

Zimbabwe 2000-2003

Pesticide management and ecotoxicology

Elucidation of the pathway, fate and impacts of insecticide pour-ons (for tsetse control using cattle as bait) in cattle dung and on dung fauna and soil fertility.  Short-term research inputs and management from1999-2003. Client: DFID

Madagascar 1999

EIA. Preparing and writing the ToRs for a full Programmatic EIA on emergency locust control (focused on widespread pesticide applications) in Madagascar for USAID.  Part of a package of assistance to the Office National pour l’Environnement (1999) that included advising on EA, scoping and identification of stakeholders, legal framework, the hiring of manager and EA consultants. Monitoring of progress and review of EA statement.  Client: USAID / Gov of Madagascar

Zimbabwe 1998

EIA: (2w) Consultant for Veterinary Department:  Preparation of full terms of reference for an EIA of proposed tsetse control measures in Matusadona National Park  Client: EC DGVIII

Zimbabwe 1997

Environmental Impact Assessment   (3w) Consultant for Veterinary Department: Preparation of ToRs for the preliminary environmental assessment of tsetse control in Matusadona National Park: responsibility for assisting stakeholders with environmental policy/regulations Client: Dept Vet Services (TTCB) Zimbabwe

Zimbabwe 1996-7

Environmental Assessment and training.  Investigation of the ecological recovery of the biodiversity of the Zambezi Valley in N.E.Zimbabwe from the impact of tsetse control operations (RTTCP) in the mid-late 1980s.  Training of staff from 5 countries of the southern African region in pest management and environmental assessment techniques. Client: EC DGVIII

Nicaragua 1996-98

Environmental Assessment: Determination of pesticide pollution in critical watersheds and basins in Nicaragua.  Project leader.  For Ministry of Environment and Natural Resources (MARENA)  Client: Inter American Development Bank

Botswana 1994

Pesticide management. (2w).  Consultancy with International Red Locust Control Organisation -CSA on safety and environmental aspects of fenthion use for Quelea control with emphasis on application systems. Client: AfDB

Uganda1993

Lake Conservation (2m):  Ecology and impact of the aquatic pest Eichhornia    crassipes (water hyacinth) on the physico-chemical parameters of littoral water, the biodiversity and abundance of invertebrates and fish along the shores of Lake Victoria.  Client: ODA

Document info
Document views25
Page views25
Page last viewedThu Dec 08 12:23:17 UTC 2016
Pages10
Paragraphs296
Words4003

Comments