Process

**Cost/yd

Area (acre) Requirements for 5’ Ht. Max

Product Solids Assumed at End of Process

Integrated System

$7-10

70

40%

Integrated System

$7-10

70

40%

Filter Press

None provided

80

35%

Filter Press

None provided

120

25%

Belt Filter Press

None provided

120

25%

Plate & Frame Press

None provided

120

25%

Bucher Hydraulic Press

None provided

120

25%

Solid Bowl Centrifuge

$20-2,000

100

30%

Deep Cone Thickener

None provided

80

35%

Hydrocyclone overflow to CDA Disposal

None provided

200

15%

Electroosmotic Filter Press

None provided

120

25%

Geotextile Tubes

$6-8

100

30%

Polymers

$2-7

200

15%*

*Estimated average solids during filling of containment area. Drying/desiccation to truckable solids may be several months **The costs for the mechanical process vary by equipment type, size and vendor. The individual pieces of equipment are not to be used alone. They are used in part of a process depending on the Integrated System designed for the specific sediment that is being dewatered. Individual vendors rental price is based on the type of equipment and duration needed. Most vendors requested project specifications in order to quote a price.

Literature Review & Summary Report Design Basis Memorandum St. Johns River Water Management District Contract # SK940AA

BCI Project No. 19-15089 September 2007 Page 22

Vendor

Genesis

Phoenix

Eagle NA

TEFSA-USA

TEFSA- USA

Ascension Industries

Atkins Water Veolia Environmental Services Dorr-Oliver Eimco USA Inc.

Linatex Tennessee

Waste Technologies of Austrlia

Miratech

Ciba Nalco SNF

Table 2 Comparison Table

Processing 1 M yds @ 45% organics; 0.1 g/cm3 bulk density

*Processing Rates to Truckable Solids (+25%)

  • +

    40 tph

Continuous

  • +

    40 tph

Continuous

  • +

    40 tph Batch

    • +

      40 tph Batch

  • +

    40 tph

Continuous

  • +

    40 tph Batch

    • +

      40 tph Batch

  • +

    40 tph

Batch

  • +

    40 tph

Continuous 193 days filling plus drying period

  • +

    40 tph

Batch

1-2 days per tube 193 days filling plus drying period

Return Water Characteristics

Truckable (Y/N)

Slurry to Dewatering Process Treat and

Return to Lake Slurry to Dewatering Process Treat and Return to Lake Slurry to Dewatering Process Treat and Return to Lake Slurry to Dewatering Process Treat and Return to Lake Slurry to Dewatering Process Treat and Return to Lake Slurry to Dewatering Process Treat and Return to Lake Slurry to Dewatering Process Treat and Return to Lake Slurry to Dewatering Process Treat and Return to Lake Slurry to Dewatering Process Treat and Return to Lake Slurry to Dewatering Process Treat and Return to Lake

Y

Y

Y

Y

Y

Y

Y

Y

Y

N

Slurry to Dewatering Process Treat and Return to Lake Slurry to Dewatering Process Treat and Return to Lake Slurry to Dewatering Process Treat and Return to Lake

Y

N/A

N