X hits on this document

140 views

0 shares

0 downloads

0 comments

31 / 55

26-Feb-02

365 days

26-Feb-03

26-Feb-01

2 yrs

31-Jan-03

28-Feb-01

2 yrs

28-Feb-03

26-Feb-01

2 yrs

26-Feb-03

4-Mar-02

365 days

4-Mar-03

3135.2

100.0

3235.2

04-Mar-02

365 days

04-Mar-03

3135.2

150.0

3285.2

3135.2

500.0

3635.2

04-Mar-02

6 yrs

04-Mar-08

2001

12 yrs

31-Dec-13

calibration ELT certification

ELT battery Altimeter - IFR use Transponder

Rails CF 87-15R2 - date Rails CF 87-15R2 - hrs Muffler CF-90-03R2 date Muffler CF-90-03R2 hrs Vacuum pump SEB02-3 Vacuum coupling SEB02-3

Fire Extinguisher

99.2

CAR 625 Appendix B contains inspection, so let’s take a quick

a complete checklist of things to consider for your annual run though of what it says:

149.2

499.2

Appendix B - Maintenance Schedules

General Procedures

  • (1)

    The Maintenance Schedule includes:

    • (i)

      Part I - Scheduled Inspections for Aircraft other than Balloons;

    • (ii)

      Part II - Scheduled Inspections for Balloons.

It must be supplemented by the applicable requirements of Appendix C, for out of phase tasks and equipment maintenance requirements.

(2) Each person performing inspections required by the maintenance schedule shall record the inspections in the aircraft technical record, using a check list that includes all items in Parts I or II that are applicable to the aircraft concerned. Additionally, all tasks required by Appendix C shall be recorded in the aircraft technical record.

Information Note:

Aircraft manufacturers' check lists can be used, provided that they include all the applicable items listed herein.

COPA Guide to Certified Aircraft 31

Document info
Document views140
Page views140
Page last viewedSat Dec 10 08:28:25 UTC 2016
Pages55
Paragraphs1172
Words19006

Comments