X hits on this document

Word document

Consider the March 19, 2007 Planning Commission minutes. - page 20 / 38

139 views

0 shares

0 downloads

0 comments

20 / 38

APRIL 2, 2007SHAWNEE PLANNING COMMISSION MINUTESPAGE 20

10.The street improvements required for this development, including the driveway approaches, shall be designed according to the standards in the Shawnee Manual of Technical Specifications and Design Criteria as detailed in the staff report;

11.The storm drainage improvements required for this development shall be designed in accordance with Division 4600, Storm Drainage, of the Shawnee Manual of Technical Specifications and Design Criteria as detailed in the staff report;

12.The applicant is responsible for submitting an impervious area plan prior to the issuance of any Certificate of Occupancy as described in the staff report;

13.On-site detention is not mandatory because the proposed nonresidential development is smaller than 5 acres.  Accordingly, the applicant is responsible for paying a detention fee of $7,000.00 per impervious acre created by the development instead of constructing an on-site facility;

14.The applicant is responsible for scheduling a pre-design meeting with the Development Review Engineer prior to preparing the final site development plans, which must show all proposed public and private site improvements.  The public improvements required for this development includes grading within the public street right-of-way, constructing new street improvements, constructing the commercial driveway approaches, constructing public drainage improvements and possibly connecting the private system to the public system.  These public improvements shall be designed according to the standards in the Shawnee Manual of Technical Specifications and Design Criteria.  The final site development plans must be submitted to the Development Review Engineer for review and approval of the public improvements prior to issuance of a footing and foundation permit;

15.Prior to issuance of a footing and foundation permit, the applicant must obtain one or more Public Improvements Permits for all street and storm drainage improvements required for the development site.  All public improvements shall be constructed according to the standards in the Shawnee Manual of Technical Specifications and Design Criteria.  No Certificate of Occupancy for the development shall be issued prior to the completion, inspection, and acceptance of all required public improvements; and

16.All fire hydrants, fire lanes and fire suppression equipment shall be installed as required by the Fire Department.

PLANNING COMMISSION QUESTIONS

Document info
Document views139
Page views139
Page last viewedThu Jan 19 15:55:09 UTC 2017
Pages38
Paragraphs484
Words15144

Comments