NOTE:  It is not enough for the contracting repair station to give its QCM to the non-certificated contractor and assume the proper procedures will be followed.  The certificated repair station must provide adequate surveillance to ensure its quality control procedures are followed.

NOTE:  Contracting out maintenance functions should not be used to replace the need for adequately staffed and trained maintenance personnel.  PIs should be cautious of repair stations that constantly revise the maintenance function list on an emergency basis in order to complete work in a timely manner.  PIs should ensure that repair stations have the necessary trained personnel for the scope and complexity of the ratings they hold.

G.

Analyze Findings.  Upon completion of the inspection, record all deficiencies; determine the appropriate corrective action(s).

H.

Conduct Debriefing.  Brief the certificate holder on the inspection results.  Discuss any deficiencies and possible corrective actions.

7.

TASK OUTCOMES.

A.Complete PTRS.

B.Complete the Task.  Completion of this task will result in the following:

Send a letter to the operator documenting all deficiencies

Initiate an Enforcement Investigation Report (EIR) if necessary

C.Document Task.  File all supporting paperwork in the certificate holder’s office file.  Update the Vital Information Subsystem (VIS) as required.

D.Any areas of noncompliance noted with a contracted repair station should be forwarded to those air agency’s PIs at the applicable CHDO.

9. FUTURE ACTIVITIES. Schedule and conduct follow up inspections as applicable.