X hits on this document

641 views

0 shares

0 downloads

0 comments

220 / 220

ATTACHMENT 29

GLOSSARY OF TERMS

Term

Definition

Baseline Surveillance Plan

The baseline surveillance program is accomplished by the PTRS activity code 3650/5650 triggering the 14 required element activity codes, which constitutes a complete facility inspection.

Controls

The certificate holder has checks and restraints in place to ensure a desired result.

Documentation

Includes certificate holder documents such as manuals, policies and procedures.

Element Assessment

Word pictures which allow for the assessment each of the 14 elements that make-up a constitute facility inspection

Overall Assessment

Word pictures which allow for the an overall assessment of the repair station as a result of the RSAT

Repair Station Data Package

This is a data package accessible to all inspectors via Safety Performance Analysis System (SPAS) available in Phase 2.  Utilize Repair Station Profile currently available in SPAS till FY07.

System Design

Includes operating environment, configuration (includes number of employees, facilities, etc.) and design (includes type of maintenance performed, ratings, etc.) of the repair station

Document info
Document views641
Page views641
Page last viewedSun Dec 11 00:37:40 UTC 2016
Pages220
Paragraphs5397
Words68086

Comments