communication to local house owners (situated above the plume)

Mulgrave, Vic

Caltex

Designed and pilot tested Soilbank (Bio-pile) soil remediation system on large retail site Obtained approval of EPA to use site to treat soil from other smaller site in the same area

Australia, Vic, SA, NSW, Qld, WA,

Ampol / Mobil / Shell / BP

carry out approx. 400 ESA's (Environmental Site Assessments) on service stations design, plan and supervise approx. 50 on-site biological soil remediation of service station (demolish & auction), & 150 projects using on- and off-site soil remediation.

1987- 1993 (remediation highlights only)

Shell Aus

Melbourne

Design & Built soilbank system to remediate approx. 60.000 tons of heavy fuel oil contaminated soil on main oil terminal

Ampol

Victoria

Carry out environmental risk assessment of potential service station locations using DRASTIC model

BP Aus

Brisbane

Design, implement and operate landfarm to treat contaminated soil and proces sludges (PAK's, HC and other proces chemicals)

Caltex Aus

Springvale

Design & Built first soilbanks in Australia Treat 30.000 tons of diesel contaminated soil on-site

Mobil NZ

Auckland, Nelson

Investigate terminal Design in-situ remediation system

Hickson Timber treatment

New Zealand

Design & Implement monitoring network Copper Chroom Arsenic, Boron & PCP contaminated site Carry out monitoring at Chistchurch plant

Conf.

Lake Taupo

Investigate 5 km long Dioxine (ex PCP) plume from timber mill

Shell Aus

Melbourne

Design and install White rot fungi remediation system (Phosphor pesticides)

Caltex Australia

Vic, NSW, Qld, WA

Investigate and remediate over 100 service stations, many country depots

Cabot Aus

Vic, Altona

Investigate groundwater contamination near PAK storage

Altona Refinary

Vic

Investigate contamination in processing and cracking areas, design system to determine coke level in PAK tanks

Wellington

BP NZ

Install in-situ remediation system which required operation during removal and transport off-site (in 1 piece) of 3 tanks (15 - 40 million litres) in project ‘BP on the Move’.