        Facilitated development of 3rd Annual Hands Across the Harbor logo for use as “Save Date for 1/29/11” to begin sponsorship development.

      • o

        Facilitated reimbursement to participants for sign grant & housing rehabilitation prog’s.

      • o

        Monitored and updated the Charlotte Harbor Website to provide current information.

      • o

        Presented to CC Historical Committee concept to include 2 parcels; commonly referred to Hickory House in CHCRA. Committee endorsed concept -BCC approved expansion.

  • Murdock Village:

    • o

      Filed/noticed ‘09 MV CRA Annual Report to DCA required by law for all Special Districts.

      • o

        Updated informational package on MV real estate offering -facilitated updating the webpage.

Facilities, Construction and Management

Jail Expansion-Design 75% early phase 1 start, selection Bovis for CM on BCC 11/28 agenda, Construction of phase one is complete. Phase 2 construction is underway. BCC project change

approved Eastport

on 3/10/09

Sales tax savings to date-$259. 000

WWTP

Control

Bldg-A/E

contract

is

released-planning

and

programming

underway

Construction is underway Budget 2 million Event Center-project is complete-warranty work underway-100% complete Fire Station #11-currently used for VM-design underway for 5300 sq ft station-1 issues resolved for building within existing footprint and landscape with scrub Design underway Budget 2.1 million. Completed. Recovery project Englewood Fire Station #5-(Rockford Ave) under design-working budget to GMP.

story. Scrub Jay habitat material.

Scrub jay issues-

negotiating with USFW for onsite mitigation. (resolved) Complete-Truck arrived. Budget 2.1 Human Services-Under design-7000 Sq/ft to house HS and Veterans Services. Project

million. Delayed

Budget 1.917 million. Project approved by BCC to restart with Mathews Taylor as contractor Precon proposal accepted by County Design phase underway project

Design/Build to be LEED

certified County to add additional office space to building State Dept of Health Facility at Loveland-under design-shared advising on process and construction. Scheduled construction is

campus with HS bldg. County underway -Completion expected

is in

April 2nd floor will be shelled space (8000sf) PW San Casa Proj under construction-Final VE items 600k -county has received CO for project PW Fleet and Administration Campus-(Bachman) RSH

Complete

-asphalt area

out for bid Budget

underway

with planning

and programming.

and design Project Delayed Budget 9.7 million Sports Stadium-negotiations complete for Hunt/MT

HOK

contract-kickoff

mtg

1/9.

Project

underway

for A/E final schematics due early June-line phase 1 underway-project on schedule for

item

cost

late

1/09

estimate also due concurrently. Construction completion Project is substantial completion

Budget 28M Project complete--First season complete. Field remediation Englewood Annex-renovation and Sheriffs substation-Project Delayed West County Library-initial project status-A/E services awarded to Spillis

work complete.

Candela-contract

accepted

by County. Project Delayed Budget 12.2 million Fire EMS Training Tower-in design at FEMA site-Project FEMA Murdock mitigation-windows-Engineering firm on been approved 1.7 million-engineering assessment phase Scheduled completion in Jan. Project is complete Rotunda Wastewater Plant Expansion –approved GMP

Canceled -Budget 1.2 million contract for frame analysis –Contract has underway Project is underway Installation FEMA inspection completed by BCC, construction start 7/9 -2 phases-

mostly CCU North Charlotte

regional

Park-bids

received

on

9/17-under

construction

  • -

    complete

4.45

million

South Gulf Cove Park- complete-1.087 million Port Charlotte Pool House and site improvements-work underway, Complete 1.4 million

Sunrise Park-out for bid-under construction- complete 2.6 million Energy efficiency upgrades-ongoing-LED lighting being installed

complete-efficiency energy

Efficiency

Coordinator

has

been

at select sites hired-county

FPL

Audit is

ARRA

grant

Monthly Report, March 2010

11 of 26