Distribution System: Completed 6 new water service line installs; responded to 68 line breaks; exercised 58 system water valves; maintained and flow tested 162 hydrants for system main; changed out 4 galvanized service lines as system maint; responded to 21 water quality calls; serviced all vehicles at Fleet that required maint; replaced a bad 12” valve at Gasparilla Marina; installed 2 hydro-guards in Tern Bay to maintain water quality in that part of the Burnt Store system; replaced 4 sample points; installed an insertion meter at the entrance of the distribution system at the Burnt Store plant to account for water going to the system as a part of the water loss reporting. Training: 4 tailgate safety meetings were held with the entire work group; 2 employees received First Aid training; 6 employees received CPR training; 3 employees attended short school for Distribution Operator training; all employees received training from the manufacturer’s rep on the new Elster Hydrasert fittings; 1 Line Tech passed his FDEP test for a Level 3 Distribution Operator license. Personnel: 1 Line Tech resigned; 1 Line Tech position has been filled; 2 Line Tech positions have been opened up but can not be filled until the bumping process is completed and 2 Line Tech positions are currently frozen. Booster Stations: #2 Golf Course remains out of service. The contractor cont with the upgrade. GCS predicts that the station should be operational by 4/30. #3 Gulf Cove performed prev maint

for the month. Contractor continues predicts that the station should be

with the upgrade process completing punch list items. GCS

completed

by

4/9.

ADF

was

2.18

MGD.

#4

Walenda

performed prev maint. Contractor remains on predicts that the station should be completed

site for by 4/9.

upgrade completing punch Jesco conducted training

list items. GCS on the chemical

pumps

on

3/17

and

Simplex

Grinnell

installed

a

new

alarm

system

for

the

building

and

tank.

ADF

was 3.12 MGD. the installation of

#6 Rotonda performed monthly prev maint. the site cameras. #2 pump was repaired.

The ADF

security contractor completed was 2.23MGD. #7 Ingraham

o o o o

Injection Station replaced a faulty bleach level indicator. ADF was 236,746 GPD. #8 Interconnect is currently off and ready to be placed back in to service when required. was exercised for 4 hrs at 750 GPM. Sampling: Monthly compliance samples have been completed. Boil Water Notices: 4 boil water notifications were processed. Wastewater Collection: Gravity Force Mains: Exercised 78 sewer valves; installed 2 valves; poured/installed valve pads; replaced 2 manholes rings & covers; inspected 52 manholes; installed

Englewood The station

3 concrete 4 manhole

risers; responded to and/or cleared 9 gravity sewer backups; repaired/replaced repaired 3 force main breaks; repaired 4 gravity sewer breaks; repaired 2 air

3 service laterals; lines (BSV); TV’d

o

and cleaned 10,337.8 linear feet of mains. Lift Stations: Performed 313 LS prev maint work orders; performed 73 orders which included check valve cleaning, pump deragging and wet well confined space entries; repaired 4 pumps in-house; installed stone around

corrective maint work cleaning; completed 3 site at LS #309, #313,

#302; met attended 2

with Siemens Technology reps regarding odor control issue at 238 White LS start-ups; ordered parts for 3 LS discharge line repairs; performed 8 LS

Marsh Ln; drawdown

o

o

calculations. Low Pressure Sewer: connections; repaired 5 tanks. Personnel: Hired 2 new

Performed 280 service calls in the field; completed 18 mandatory leaks; upgraded 11 systems to current standards; replaced 2 collapsed

employees starting date was 3/17; recertified 9 employees on Fork Truck

Safety & Ops; recertified 3 employees employees attended the FWPCOA Short

on CPR; School -

1

employee

attended First

2

for Reuse

System Ops, 2

Aid training; 5 for Wastewater

Collection “B”, 1 for Wastewater Collection “A”; 1 employee attended in-house meeting and Health & Safety meeting/inspections; 1 employee met with Peerless employees attended Gorman Rupp Pump demonstration. Business Services:

Focus Pump

Group rep; 2