East Port Ops Bldg: Construction of the new ops building is nearing completion. The proposed move in date has been postponed slightly due to rain delays. Off-site construction of a new steel building to house a second belt press has commenced. Installation should quickly follow. Spatial Info Assessment (Geodatabase): Staff continued work updating the Geodatabase with the

back log of wastewater, potable process of verifying existing utility

water and reclaimed water as-built data.








Staff started the




request was sent to IT to have ArcReader software loaded on 16 work stations so Geodatabase can be accessed and viewed by a selected group of CCU personnel. Rotonda Villas & Springs Water & Wastewater System: General Contracting continues

that the

to install

the LPS and proposed by

water mains in Rotonda Villas. It was agreed to approve the odor control units PureAir Filtration. The equipment will be evaluated for inclusion on the Approved

Materials List after the lift stations are placed for the lift station telemetry was conditionally

into operation. The Data Flow Systems submittal approved by Stantec. The surveyor hired by FPL


began work on staking out the proposed power lines that must be run to the constructed. Rotonda Sands & Meadows Water & Wastewater System: These projects


lift stations being


complete and in-


service. Some connections to the sanitary sewer systems have been being scheduled with the homeowners. A final “true-up” change order prepared to address final quantities as per the record drawings. Lift Station Rehabs: 321 & 806 - Plans and specs have been revised

completed and others are for BCC approval is being

after final comments were

o o o o o o

made by CCU staff. FDEP permit applications for each LS have been prepared and sent to FDEP for approval. An application for a Special Exception to the Board of Zoning Appeals construction of LS 321 on a newly purchased vacant lot was completed and submitted to Zoning Official. 8 – CCU staff continues to monitor the situation with RES. There has been no change. 24 – Permanent easement for the new LS site is being pursued. 855 – Project is completed and in-service. 84 – Ops completing the upgrading of LS in-house. Babcock Ranch: Additional correspondence sent to SFWMD regarding this WUP as directed. Control Structures: Sunset & Lionheart WW: FDEP approved the new package lift station for Aqua Gardens Condo’s. Testing was completed and the lift station was placed into service.

the for the


o o

Rotonda Weirs: Pre-Bid meeting Lionheart WW @ Quesada, Morningstar WW @ Peachland:

was held on 3/11. Bids were opened on 3/24. Sunset WW @Kenilworth, Dorchester WW @ Peachland, FDEP wastewater applications to construct were approved for



the new structures at Lionheart, Dorchester and Morningstar Waterways. Cape Haze Bridge: The contractor completed installing all the utility lines into service. The punch list is currently being prepared for the contractor. Sidewalks: Year 1 - Johnson Engineering has submitted the 60% plans for

and has placed them

review. CCU facilities


are affected in 3 of the 6 areas; Year 2 – RFP has been issued being reviewed for award to design. Midway Force Main & LS Rehabs: Project is being included in

by Purchasing and proposals are

the Midway Widening project as


each phase is constructed. Midway Widening (PW) Phase construction. This portion of the

1: The Yale, Elkcam and project is being constructed

Niagara by Peter

WWs are continuing with A. Basil. The Ph I roadway


contract (from Elkcam to Birchcrest Blvd) has been awarded pre-con meeting was held on 3/22. The Fordham WW plans FDEP permits were submitted. Rotonda Reclaimed ASR Well: The BCC selected Johnson contract and authorized staff to start negotiations. SWFWMD

to McLeod Land Services and the were finalized and applications for

Engineering for the Const Admin had no objection to the selection of

JE for the submitted the scope

work, but must pre-approve the final scope prior to preliminary drafts of the scope on 3/22 and 3/24. was held with Purchasing, CCU and JE on 3/24.

the County executing a The first in a series of

contract. meetings

JE on

Monthly Report, March 2010