Deep Creek Force Mains & LS 303–309: Bid docs for revised proj (include only force main from LS # 309 to East Port Lift Station) being finalized per latest project revision to minimize costs. Coral Creek Bridge: Construction proceeding and on schedule. SWFL Feasibility Study: CCU staff continues to monitor the progress of this study. The SWFFS project team is preparing final report to be submitted to Congress in very near future. FDOT Projects: US 41 @ Midway Blvd: Extend south bound left turn lane; US 41 @ Murdock Cir: Extend south bound left turn lane and relocate traffic signal at SW corner;

o

SR 776 @ Coliseum Blvd:

Install

Veterans

Blvd:

Add

east

bound

left

new traffic signal & turn lane on Murdock

improve intersection; Murdock Cir @ Cir & improve intersection; Peachland

Blvd: Install new sidewalk on north side Casa Dr to Sunnybrook Blvd: FDOT to access roads; Cape Haze Pioneer Trail:

between Comstock St & Hallcrest Ter; SR 776 @ San install landscaping within the mediums and along the FDOT to install a new 8’ asphalt trail beginning on the

o

north side of CR 771 and running along the existing eventually connect to the new Coral Creek Bridge. Edgewater Dr Ph II: A PWs design project to widen

trail east to

its terminus. The new trail will

the existing

2 lane roadway to a divided 4

o

lane roadway between Midway & Harbor Blvds. CCU will be upgrading the wastewater mains, including installation of a new reclaimed water main. Placida Road: A PWs design project to widen the existing 2 lane roadway to roadway between Rotonda Blvd W & Cape Haze Dr.

existing water &

a divided 4 lane

Monthly Report, March 2010