Example 2: Multi-Building Project

A project consists of three buildings with 75 units in each building. The owner elected a 40/60 minimum set-aside. In total, there are 225 units and at least 90 must be qualified LIHC units to meet the minimum set-aside. The state agency must review 45 files. To satisfy the minimum set-aside test, 18 of the selected units must be in compliance.

Date of Noncompliance

In the event that noncompliance results in the failure to meet the minimum set-aside for the first year of the credit period, the taxpayer is prohibited from ever claiming the LIHC; the date of noncompliance is the last day of the taxable year of the first year of the credit period.

Example 1: First Year Lease Up

The owner did not lease the minimum number of units to income eligible tenants by the end of the first year of the credit period.

The date of noncompliance is the last day of the first year of the credit

period.

The state agency should issue Form 8823 indicating Category

11f, Project failed to meet minimum set-aside requirements, and Category 11p, Project is no longer in compliance nor participating in the program, if Form 8609 has been filed with the IRS.

If the project meets the minimum set-aside by the end of the first year, but fails to meet the minimum set-aside at the close of a subsequent taxable year in the compliance period, the entire credit is lost for that year. The date of noncompliance is the last day of the taxable year for which the minimum set-aside was not met.

Back in Compliance

First Year the Credit Period

of

If a project failed the first year minimum set-aside requirement *at the close of the first taxable year of the credit period*, the noncompliance cannot be corrected and the owner is prohibited from ever claiming the LIHC. The date of noncompliance is the last day of the first taxable year of the credit period for that project. The state agency should issue Form 8823 indicating Category 11f, Project failed to meet minimum set- aside requirements and Category 11p, Project is no longer in compliance and is no longer participating in the program.

Years Subsequent to the First Year of the Credit Period

If the minimum set-aside violation occurs after the first taxable year of the compliance

period, the project is back in compliance for the taxable year in the compliance period in which the minimum set-aside is met, determined as of the close of that taxable year.

Example 1: Fees for Assisted Living Services

The first taxable year of the credit period ended December 31, 1998 for a 100 percent LIHC building. The units were all rented to income qualified households. Subsequently, in 2003, the owner charged all households a fee for mandatory assisted-living services. This fee, when