X hits on this document

82 views

0 shares

0 downloads

0 comments

20 / 33

Texas

CenterPoint Energy - Houston

Project description  

Number of meters

Costs and benefits

Deployment

Planned enhancements

2.4 million

Capital cost - $639.6 million

Est. savings and benefits - $120.6 million during surcharge period (12 years)

2009 through 2014

ARRA funding proposal may include remote control switches, a Distribution Management System to enable management and control of microgrids and integration of wind and solar, fault location characterization software, predictive failure analysis software, and PHEV demo

AMI with two-way network (WiMax radios); remote connect/ disconnect; consumer education; home monitors for low-income

Sources: Filings in TPUC Docket No. 35639; Smart Grid Today, 4/27/09; CenterPoint filing in Project No. 36674.

Document info
Document views82
Page views82
Page last viewedFri Dec 09 22:44:09 UTC 2016
Pages33
Paragraphs393
Words2611

Comments