You are advised that the Environmental Impact Assessment does not look at incorporating surface-water

course control or sustainable drainage measures into the development. The applicant should, therefore,

consult the Environment Agency for advice on how sustainable water drainage techniques might be applied

to this site.

You are advised to contact a competent consultant to undertake an appropriate ecological survey for

Protected species (particularly bats) as advised by English Nature.

Construction and demolition works, audible at the boundary should only be carried on between the hours of 0800-1800hrs Mondays to Fridays and 0800-1300 hrs on Saturdays.

Vibration from demolition, breaking of concrete and piling etc., as measured in the vertical direction on any floor in surrounding noise sensitive buildings, should not exceed an overall peak particle velocity level of 1mm/s.

Prior to commencement of construction and demolition works, details of noise/vibration and dust mitigation measures should be submitted to Environmental Health section for approval.

Prior to commencement of construction and demolition works, involving materials containing asbestos, details of mitigation measures to control the release of asbestos dust must be submitted to Environmental Health section for approval.

No bonfires should be lit on site.

Stone crushing plant may require authorisation under the Environmental Protection Act (Prescribed Processes and Substances) Regulations 1991, SI 472.  Contact the LBE Pollution Control Section on 020-8758 5633.

The Health and Safety Executive should be consulted with regard to the safe handling and disposal of asbestos during the demolition phase.  Contact 020-7556 2100.

You are advised to consult The West London Tram Project with respect to the tram proposals.

The decision to grant planning permission has been taken having regard to the policies and proposals in the adopted Ealing Unitary Development Plan and the deposit replacement Ealing Unitary Development Plan and to all relevant material considerations including Supplementary Planning Guidance.

Replacement UDP Policy

Strategy

1.10

Legal Agreements and Partnerships

Environmental Resources and Waste

2.1

Environmental and other sustainability impacts

Urban Design

4.1

Design of Buildings

4.2

Inclusive Design – Access for All

4.4

        Community Safety

4.5

         Landscaping, Tree Protection and Planting

4.11

Noise and Vibration

Housing

5.1

Housing Supply

5.2

Affordable Housing

5.3

Lifetime Homes and Wheelchair Housing

5.5

        Residential Design

Transport

9.1

Development, Access and Parking

g:\areateam\planning committee\25 february 2004\bromyard house, bromyard avenue.docPage 9  of  25