X hits on this document

PDF document

Meiling_Hall-95.doc - page 10 / 31

74 views

0 shares

0 downloads

0 comments

10 / 31

Foundation

4.4

442,860

.92

407,431

Columns and Beams

13.1

1,318,515

.92

1,213,034

Exterior Walls

9.5

956,175

.82

784,064

Windows & Doors

4.6

462,990

.82

379,652

Roofing

2.9

291,885

.66

192,644

Partitions & Drs.

7.8

785,070

.86

675,160

Wall Finishes

3.6

362,340

.74

268,132

Floor Finishes

8.3

835,395

.79

659,962

Ceilings & Finish

8.2

825,330

.73

602,491

Conveying

3.1

312,015

.76

237,131

Plumbing

2.5

251,625

.79

198,784

Heating

10.0

1,006,500

.77

775,005

Cooling & Vent.

7.7

775,005

.66

511,503

Elec. Ser. & Dist

1.5

150,975

.80

120,780

Lighting & Power

12.2

1,227,930

.76

933,227

Safety Standards

.6

60,390

.63

38,046

TOTALS

100.00

10,065,000

7,997,046

COMPONENT

BUILDING

VALUE

BUILDING

PERCENTAGE

COMPONENT

MULTIPLIER

COMPONENT

OF TOTAL

REPLACEMENT

FOR BLDG.

CURRENT

COST **

COST

COMPONENT

VALUE

BUILDING

CONDITION

COMPONENT

FACILITY NAME: MEILING HALL INSPECTOR: AUGUSTUS J.R. VAN BUREN

YEAR CONSTRUCTED: 1970 GROSS SQ FT: 75,274 REPLACEMENT COST $ 10,065,000 *

NET SQ FT: 46,408

FAC # DATE:

281 12/95

  • *

    Replacement Cost assigned September 1991 by The Office of University Resource

Planning and Institutional Analysis without the furnishings and fixed equipment allocation.

** Percent

allocation of each building component

is

calculated from The Means

Standard Construction Cost data for College Classroom Buildings.

Meiling_Hall-95.doc

10

Document info
Document views74
Page views74
Page last viewedSat Dec 03 00:42:42 UTC 2016
Pages31
Paragraphs1722
Words5536

Comments