the

Ohio

State

University

(Main

and

Branch

Campuses)

and

Recommendations

for

Corrective Action

materials

in

the

by

pipe

PEI Associates, September 1986, insulation in the penthouse and

identifies asbestos containing in the mechanical room in the

basement.

BUILDING PERIMETER

There are three entrances to this building.

At the south entrance, the steps

have shifted over time due to freezing and thawing conditions and need to be relaid.

The stone work around the relaid. The two entrances from the sidewalks and do

planting beds south of the main entrance also need to be

of the north side not provide space

of the building have for handicap ramps.

steps leading down The entrances and

building approaches were adequately identification were in good condition.

lighted.

Exterior

signage

and

address

There are mature trees and shrubs on the east, south and west side of the building. There is a bare area at the northeast corner of the building and ground cover or some other erosion-preventing material should be installed in this area.

There is no driveway to the building and there is no loading dock. Deliveries are made through the tunnel system. A concrete sidewalk on the west side of the building should be repaired at the curb on the northwest corner of the building.