X hits on this document

22 views

0 shares

0 downloads

0 comments

5 / 8

Figure 1-2. Location to drill 1/8” holes on fog light grille.

2.2) Place the new grille in the opening, taking caution to not scratch the paint when fitting the grille. The grille should fit snug enough that it will stay in place allowing the use of both hands to install the nylon ties.

2.3) Run a nylon tie through each of the drilled holes and through the closest loop on the edge of the grille. Install all 6 ties loosely first, then make final adjustments to the positioning of the grille. Finally, tighten all ties and cut their tails with angle cutters..

Figure 2. Location of nylon ties for new grilles.

2.4) Install the upper grille. With the lower grille installed, you will next need to drill 6 holes for the upper grille. These holes (1/8”) are placed in the center and near the lip of 6 of the tabs around the upper opening, as shown in Fig. 3.

6

Document info
Document views22
Page views22
Page last viewedFri Dec 02 22:40:39 UTC 2016
Pages8
Paragraphs58
Words1057

Comments