X hits on this document

PDF document

DEPARTMENT OF THE NAVY - page 13 / 16

43 views

0 shares

0 downloads

0 comments

13 / 16

ENGINEERING STATISTICS

JANUARY 1972

1. During the month the ship fresh and feed water, utilizi hours, No. 2 evaporator for 4 Number 4 evaporator was not u

distilled 1,410,910 gallons of ng number 1 evaporator for 502 37, No. 3 evaporator for 297 hours. sed.

2. 22,455 gallons of JP-5 wer were received.

e expended and 14,300 gallons

3. 662,084 gallons of NFSO we were expended in January.

re received and 737,938 gallons

4. The ship steamed 288 hours way. 0 hours were spent cold

underway and 456 hours not under- iron.

5. Number 1 boiler was steame 236.7 hours, No. 3 was steame 250.7 hours.

d 297.2 hours, No. 2 was steamed d 277.2 hours, and No. 4 was steamed

FEBRUARY 1972

1. During the month the ship fresh and feed water, utilizi No. 2 for 622 hours, and No.

distilled 1,798,630 gallons of ng No. 1 evaporator for 609 hours, 3 for 478 hours.

2. 12,193 gallons of JP-5 wer gas turbine generator. 18,219

e expended by the helicopter and gallons were received.

3. 688,695 gallons of NSFO we were expended.

re received while 803,742 gallons

5. No. 1 boiler was steamed 3 hours, No. 3 was steamed 386. hours.

22.1 hours, No. 2 was steamed 259.3 0 hours, and No. 4 was steamed 344.1

MARCH 1972

1. During the month the ship fresh and feed water, utilizi No. 2 for 173 hours, No. 3 fo

distilled 450,130 gallons of ng No. 1 evaporator for 161 hours, r 124 hours and No. 4 for 0 hours.

2. 14,190 gallons of JP-5 wer gas turbine generator. 14,963

e expended by the helicopter and gallons were received.

4. The ship steamed 552 hours way.

underway, and 144 hours not under-

Document info
Document views43
Page views43
Page last viewedMon Dec 05 05:30:49 UTC 2016
Pages16
Paragraphs298
Words4278

Comments