X hits on this document

PDF document

DEPARTMENT OF THE NAVY - page 15 / 16

51 views

0 shares

0 downloads

0 comments

15 / 16

3. 1,067,853 gallons of NSFO were received while 955,133 were expended.

gallons

4. The ship steamed 637.5 hours underway, and 2.5 hours n underway.

ot

5. No. 1 boiler was steamed 244.2 hours, No. 2 was steame hours, and No. 3 boiler was steamed 263.9 hours, and No. steamed 391.2 hours.

d 415.5 4 was

AUGUST 1972 COLD IRON (RESTRICTED AVAILABILITY) SEPTEMBER 1972

1. During the month the ship distilled 558,120 gallons of and feed water, utilizing No. 1 evaporator for 245 hours, for 300 hours, and No. 3 for 141 hours, and No. 4 for 20

fresh No. 2 hours.

2. 3,679 gallons of JP-5 were expended by the helicopter gas turbine generator. 28,002 gallons were received.

and

3. 576,266 gallons of NSFO were received while 615,218 ga were expended.

llons

4. The ship steamed 120 hours underway and 336 hours not

underway.

5. No. 1 boiler was steamed 155.6 hours, No. 2 was steame hours, No. 3 was steamed 220.7 hours and No. 4 was steame hours.

d 70.9 d 201.3

2. l0,240 gallons of JP-5 were expended by the helicopter gas turbin generator. 20,731 gallons were received.

3. 867,293 gallons of NSFO were received while 903,323 ga were expended.

  • 4.

    The ship steamed 432 hours underway, and 48 hours not

  • 5.

    No. 1 boiler was steamed 305.3 hours, No. 2 was steame

hours, No. 3 boiler was steamed 159 hours, and No. 4 was 268.5 hours.

JULY 1972

1. During the month the ship distilled 1,762,670 gallons fresh and feed water, utilizing No. 1 evaporator for 637 No. 2 for 637 hours, No. 3 for 552 hours, and No. 4 for 9

2. 22,817 gallons of JP-5 were expended by the helicopter gas turbine generator. 0 gallons were received.

3

and

llons

underway.

d 177.6 steamed

of hours, 1 hours.

and

Document info
Document views51
Page views51
Page last viewedSat Dec 10 14:58:17 UTC 2016
Pages16
Paragraphs298
Words4278

Comments