Name of Customer: OIL INDIA LIMITED

d)

P.O. Order No.

_________________

dated

______________

.

D. GENERAL TERMS AND CONDITIONS FOR TRANSFORMER

1.

Party should furnish all relevant technical particulars as mentioned in Appendix #B of

IS: 2026 #1977, Part-I along with the offer. above under headings A, B & C.

Offer should also cover all points mentioned

2.

Bidder should mention the no load losses, load losses & efficiency at 50% & 75% and

100% load (0.8 pf) on transformer with the offer.

3.

This Auto Transformer (outdoor type) will replace the existing 12000KVA Auto

Transformer (outdoor type) and will be placed in the same foundation without any

modification of the foundation.

4.

Size of foundation: (length) 1610 mm X (breadth) 1000 mm X (height) 300mm. Bidder

should confirm the same along with the offer. Bidder may visit OIL's LPG Recovery Plant for

exact requirement at their own cost.

5.

Bidder should submit with offer the list of customers to whom transformers of similar

rating & type (as per NIT) have been sold during last five years.

6.

Routine and type test certificate for similar transformer should be furnished along with

the offer.

7.

Dimensional / drawing of similar transformer including cable box (both HV and LV),

etc. should be furnished along with the offer.

8.

Confirmation to guarantee clause as per point no. 17 should be mentioned in the

offer.

9.

Offer must be complete with technical catalogue/ literature and drawings giving

details as required by NIT.

10. only.

Materials should be procured either from manufacturer or their authorized dealers

11.

Dealers must submit valid authorized dealership certificate along with the offer,

otherwise offer will not be considered for evaluation.

12.

Dealers should submit with offer an undertaking from the transformer manufacturer

that in the event of an order on the party the transformer manufacturer will supply the

transformer through the party as per specifications of the tender and order.

13.

In case of an order the party should get the detail transformer drawings approved

from OIL within one month of placement of order. The manufacture of the transformer

should start only after approval of drawings by OIL.

14.

The transformer should be offered for pre-dispatch inspection and all routine tests as

per IS: 2026 should be carried out in presence of OIL engineer.

15.

Four

sets

of

manufacture's

routine

test

certificates

should

be

provided

to

OIL's

Page 4 of 16

Document info
Document views43
Page views43
Page last viewedFri Dec 09 06:06:24 UTC 2016
Pages16
Paragraphs817
Words5847

Comments