X hits on this document

55 views

0 shares

0 downloads

0 comments

10 / 32

INSTallaTION INSTRUCTIONS ONlY FOR USE bY CERTIFIED, lICENSED INSTallERS

Delivery Inspection

The ECOPOD–N® Fixed Film Wastewater Treatment system has been carefully manufactured, inspected and tested at the factory before shipment. Upon receiving the unit, please follow this procedure.

2.

After unpacking, inspect the unit to ensure no components are missing. Also inspect for damage to the unit. If any discrepancies are found, notify Delta Environmental Products at 1-800-219-9234

1.

Before unpacking, check the packaging for signs of damage. If there is evidence of damage or abuse, notify Delta Environ- mental Products at 1-800-219-9234

If the unit is free of damage, unpack completely and proceed with the installation.

System Components-Reactor Tank

Air Pump Installation

10

Document info
Document views55
Page views55
Page last viewedMon Dec 05 12:03:35 UTC 2016
Pages32
Paragraphs563
Words7216

Comments