X hits on this document

145 views

0 shares

0 downloads

0 comments

47 / 57

Randolph County                                                                                                                     Bid 07-1001

Due Date:  Thursday, October 25, 2007, 3:00P.M.                                                         EMS Ambulances

_____________________________________________________________________________________

11.0PREPARATION FOR PAINTING, COLOR AND MARKERS

11.1

Color, Paint and Finish:

Ambulance body and all attached equipment exterior surfaces, except polished metal parts, shall be thoroughly cleaned, treated, and coated with a firm primer and preservative with rust inhibiting properties, and painted white to match the OEM chassis. Ferrous metal interior surfaces shall be painted or, when not exposed for painting, shall be treated or coated to resist corrosion.

The final stage manufacturer’s painted components shall have a paint film not less than 1.25 mils. thick and a minimum total thickness of 4 mils., including primers. The final film of painted surfaces shall be smooth and uniform, free of grit, streaks, blushing, runs, sagging, blisters, “fish-eyes, “orange peel”, pinholes, or other surface irregularities. Exterior finish paint shall not be required on the underbody and inside surface of the body skirting.

Does your bid comply with this requirement?Yes   _____   No   _____

11.2Beltline Stripe:   

The   ambulance shall have a solid uninterrupted non painted reflective orange belt. The belt should be as close to parallel as possible with the road but a belt transition angle is acceptable to connect the module beltline stripe with the chassis stripe. The reflective orange belt  shall not be less than 10" wide, nor more than 12" wide and shall encircle the entire ambulance body at the belt line below the bottom edge of cab windows but may exclude the front of the hood panel. The stripe shall be of reflective material.  Orange belt color shall resemble Omaha Orange.

Does your bid comply with this requirement?Yes   _____   No   _____

11.2.1 A black, non-reflective .250" pinstripe shall be applied to the edges of the reflective Omaha Orange beltline stripe.  

Does your bid comply with this requirement?Yes   _____   No   _____

11.3Color Standards and Tolerances:  

Color standards and tolerances shall be as required by paragraph 3.16.2.1 of Federal Specification KKK-A-1822E.

Does your bid comply with this requirement?Yes   _____   No   _____

11.4

Salt Spray Resistance:  

Salt spray resistance shall meet the requirements of paragraph 3.16.2.1 of Federal Specification KKK-A-1822E.

Does your bid comply with this requirement?Yes   _____   No   _____

Page 47 of 56

Document info
Document views145
Page views145
Page last viewedSun Dec 04 11:15:30 UTC 2016
Pages57
Paragraphs1140
Words17169

Comments