Consulting & Execution

Mar 97-present

Apr 08 -present

Aug 96-Feb 97

Feb 95-Jan 97

  • -

    Owner, and General Manager- International Institute for

Geotechnics & Materials (International IGM). A leading company in Lebanon, with more than 40 employees operating with 5

divisions:

Investigation,

Design,

Contracting,

Research

&

Computing. The company has a fully equipped Lab and a sizable f l e e t o f s p e c i a l i z e d e q u i p m e n t f o r P i l i n g , M i c r o p i l i n g , A n c h o r i n g Its reputation was acquired by , Shotcreting, HP Injections, etc…

Design/Built and/or innovative solutions for shoring and foundation systems… and now has spread beyond borders…

International Level: Indevco Factory: Footings for Dynamic Generators (Saudi Arabia- 2003) Sheikh Allah Mall & Towers: Soil & Piling expertise (Iraq- Irbil, 2004) Indevco Factory : Soil & Piling expertise (USA - Georgia- 2004) YF Resid. Complex- 6 Gerard: Piling expertise (Nigeria- Lagos, 2004) Aboto Bridge: Piling expertise & Remediation (Nigeria- Ondo, 2005), Homan Village: Foundation Systems for 50 villas (Djibouti- 2006) Amassoma Bridge: Complete Structural and Pile design (Nigeria- 2006) Freeman Residence: Slope Stability Analyses (USA- Texas, 2006) Okbia/Nembeh Highway: Evaluation ,Pav.mt & Bridges (Nigeria-06) Pointe du Hoc: Expertise on Erosion & Cliff Stability (France- 2006) Ondo Highway: Remediation to Embankment Failure (Nigeria- 2006) Audi Bank: Geotech & Structural expertise on old bldg (Syria- Halab, 2006) Soma Windfarm Project: Geotech Expertise (Turkey- Izmir, 2007) Ondo Phase II + Ughelli Bridge Dualization (Nigeria- 2007) Banana Bay Towers: Piling expertise (Nigeria – Lagos, 2007) Alape Bridge: Complete Structural and Pile design (Nigeria - 2007) Sanitary Networks Design &supervision of 30m deep shafts (SA- Jeddah, 2007) Lekki Mosque: Pile groups for 45m high minarets (Nigeria- Lagos,2007) Masri Eng’g: Geotech & shoring expertise (Emirates- Abu Dahbi ,2008) Palin Dams: Head of Design Team for 2 DOD Dams (Afghanistan, 2009) Abennoma Bridge: Evaluation of bridge failure (Nigeria, Port Harcourt, 2009)

Ref. Projects in Lebanon : Fouquet tower (Shoring 25m deep), Saifi Attics (Shoring 22m), Zeino II tower (Shoring 16m deep), Alta Vista tower (Uplifting 1200T 22 stories tower after terrorist bomb) , Dennieh Cable-Stay Bridge & Rock Cliff (Geotech Expertise), Chambre of Commerce- Tripoli (Shoring 14m deep), Justice Palace- Tripoli (Shoring 14m deep), Akkar Tunnels (Piling with Top/Down Technique), Sanita Factory (Innovative Micropiling Foundation Solution + Complete Concrete Construction), Harissa Highway (Shoring, Permanent Shotcrete Nailed Walls + Construction of 4 Bridges) , Hilton Hotel (Shoring with Special Dynamic Anchors to resist Implosion), Lebanese Order of Physicians (Shoring 30m deep with 15m below water level) , Levant Hospital (Shoring 22m deep), Sagesse University (Shoring 12m deep with nailed shotcrete), Zahrani Interchange (Piling), Underpinning of Wehbeh bldg (using Micropiles), etc… A full qualification document of iIGM is available upon request.

www.i-igm.com-

  • -

    Partner, and Director, IGM/Nigeria

. This company is a branch of

Int’l IGM, and a child company to a large group YF construction based in Lagos , Nigeria. IGM/Nigeria is specialized in deep piling works, utilizing both CFA and Bentonite drilling technologies.

  • -

    Owner, Partner, BKS Consultants. Establishing a new consulting firm that

offers professional geotechnical services. Testing (NDT) of Foundations.

Expertise in Non Destructive

  • -

    Project Manager, with Entreprise E. Acar, Residential center with 35

apartments, 4m$ turn key project.

  • -

    Project Manager, Entreprise E.

Bkerke-Harissa

highway.

22m$

Acar. Main contractor of the Jounieh- project with works involving, but not

limited

to,

tunnels

and

excavations, retaining walls, drainage 8km pavement, Residential Center

systems,

2

bridges,

2