X hits on this document

157 views

0 shares

0 downloads

0 comments

15 / 53

To Pretoria

Existing and Planned Stormwater Management Network

BWLC

Development Consortium

|

CURRENT REALITIES

3.6 Stormwater

The roads and stormwater network in Linbro Park are in a poor condition and a complete upgrade will be required to accommodate any new development.

The stormwater system proposed for Linbro comprises of surface drainage, kerb inlets, pipe culverts and attenuation in three ponds

located at the lowest points on development boundaries of Linbro Park.

the

The stormwater reticulation system does not pose a constraint to future development, since easy extension is possible. Although, new development may be restricted to commence closest to the stormwater attenuation ponds and outfall points to reduce initial infrastructure costs.

A coordinated and sustainable Stormwater Management Plan should be undertaken in light of the stormwater output from the development envisioned.

Longmeadow

LINBRO PARK: Urban Design Framework Plan

June 2010

15

Document info
Document views157
Page views157
Page last viewedThu Dec 22 23:29:37 UTC 2016
Pages53
Paragraphs1374
Words10712

Comments