CURRENT REALITIES

N1

3.14 Constraints

Woodmead

  • The implementation of the K113 and

extension of Marlboro Drive is key to unlocking the full potential of the area.

M1

Frakenwald

Marlboro Station

Alexandra

Linbro Business Park

Link Sewer Attn. Pond Elec. Substation

Link Sewer Attn. Pond

Early Development Opportunities

Landfill

Elec. Substation Attn. Pond Link Sewer

New Water Tower

Modderfontein New Town Centre

Centenary Way

  • The area is based on private vehicle

transport, with an underdeveloped public transport system.

  • There is a lack of infrastructure and new

development may initially be restricted to

commence closest to the accesses and new connection

current road points for the

outfall

sewers,

stormwater

systems

and

electrical substations infrastructure costs.

to

minimise

upfront

  • A new water tower is required to provide

sufficient pressure to the southern portion of Linbro.

  • Power supply constraints due to generation

may limit the rate of future development.

Longmeadow

N3

BWLC

Development Consortium

|

LINBRO PARK: Urban Design Framework Plan

June 2010

23