X hits on this document

240 views

0 shares

0 downloads

0 comments

23 / 86

Kinross

30

1

Good

0

0

1

78

Newberry-

54

1

Fair

9

0

1

77

22

1

Good

3

0

4

12

36 34 287

1 1 9

Good Fair 6 (Good) 3 (Fair)

0 3 30

0 2 7

0 3 12

38 30 327

28 9 8

1 1 1

Good Good Good

2 0 7

0 0 2

0 0 0

37 12 0

29 60

1 2

Good Good

1 2

1 1

0 0

17 10

33

2

Good

3

5

2000’ boardwalk 12 0 1 13 + 2000’

10

25 49 36 277

0 1 1 11

Fair Fair Fair 6 (Good) 3 (Fair)

4 0 0 19

5 0 2 16

4 59 42 191

41

0

Good

162

4

0

26

5/4/05 Draft VI

UP Cycle Bass Lake Birch Hill Brevort – Trout Lake Foreman Lake

26 9 63

1 1 1

Good Good Fair

3 0 12

0 0 5

3 0 0

22 8 53

13

1

Good

0

0

0

9

The inventory included 82 designated trails and routes covering 2,705 miles. It does not include portions of the Michigan Cross Country Cycle Trail connectors managed by the DNR. Table 8 specifically focuses on the length of trail mileage, the number of designated trailheads, the condition of the trail/route and key trail infrastructure features that directly affect rider safety and trail maintenance costs.

Rexton Porterfield Lake Sandtown Silver Cr. UP Cycle Trails UP ATV Baraga Pl. Bay City L Cranberry Lake Danaher P Drummond Island Forest Islands Norway Pine Ridge Two Heart UP ATV Trails UP Route B. Nicholls

23

ings

Table 8. Designated ORV system mileage, condition and infrastructure by trail/route.

Mile

Desig -

Condition

-age

nated Trail- heads

(a)

Culve rts

Trail

/Route

Bridges

Boardwalks

Road

and Pathway Cross-

Document info
Document views240
Page views240
Page last viewedThu Dec 08 06:12:05 UTC 2016
Pages86
Paragraphs2735
Words35014

Comments