London Market Implementation of ACORD DRI Messages and Data

Endpoint Reference (subject to final A&S design of “urgents” process),

Re-sent message item

Ping port

A.4DELIVERY TIMETABLE

The following will be delivered to External Integration Testing (EIT) on 10/06/06, Market Acceptance Testing (MAT) on 19/06/06 and Production, subject to satisfactory completion of MAT, on 11/09/06:

RLC 2005.2, (including ClaimEntry, date format change and A54 table with new document types added but excluding Placing Exchange and upgraded A45 table of error codes)

DRI 1.2

AMS 1.4 (including the population of the security profile code with the code that indicates the basic security profile is used, but excluding Endpoint reference (subject to final A&S design of “urgents” process), re-sent message item and ping port)

Note that the A&S utility repository functions (create folder, download folder & so on) are not due for delivery to MAT until 23/10/06

The details of the deliveries to MAT and Production are shown in Tables 1 and 2 respectively at the end of this document.

A.5APPROACH

London Market Implementation of ACORD DRI Messages v1.doc

Page 44 of 48