X hits on this document

108 views

0 shares

0 downloads

0 comments

3 / 45

Clearwater Oil Company, Ltd.

Big Bear Lease No. 2 Production Facility

SAMPLE Spill Prevention, Control, and

Countermeasure (SPCC) Plan

Page

Cross-Reference with SPCC Rule

4

Introduction

5

Management Approval

6

Professional Engineer Certification

6

Plan Review

7

Location of SPCC Plan

7

Certification of Substantial Harm Determination

8

Part I - General Facility Information

    1.1 Company Information

9

    1.2 Contact Information

9

    1.3 Facility Layout Diagram

10

    1.4 Facility Location and Operations

10

    1.5 Oil Storage and Handling

11

    1.6 Proximity to Navigable Waters

12

    1.7 Conformance with Applicable State and Local Requirements

12

Part II - Spill Response and Reporting

    2.1 Discharge Discovery and Reporting

13

    2.2 Spill Response Materials

14

    2.3 Spill Mitigation Procedures

15

    2.4 Disposal Plan

16

Part III - Spill Prevention, Control, and Countermeasure Provisions

    3.1 Potential Discharge Volume and Direction of Flow

18

    3.2 Containment and Diversionary Structures

19

    3.3 Other Spill Prevention Measures

22

    3.4 Inspections, Tests, and Records

23

    3.5 Personnel, Training, and Discharge Prevention Procedures

27

Appendix A - Facility Diagrams

30

Appendix B - Tank Truck Loading Procedure

32

Appendix C - Monthly Inspection Checklist

33

Appendix D - Record of Dike Drainage

34

Appendix E - Discharge Prevention Briefing Log

35

Appendix F - Discharge Notification Procedures

36

Appendix G - Equipment Shut-off Procedures

41

Appendix H - Written Commitment of Manpower, Equipment, and Materials

42

Appendix I - Oil Spill Contingency Plan

43

List of Tables

-X-

Version 1.0, 11/28/2005

Document info
Document views108
Page views108
Page last viewedThu Dec 08 15:15:56 UTC 2016
Pages45
Paragraphs1416
Words11860

Comments