Clearwater Oil Company, Ltd.

Big Bear Lease No. 2 Production Facility

SAMPLE Spill Prevention, Control, and

Countermeasure (SPCC) Plan

APPENDIX D: Record of Dike Drainage

This record must be completed when rainwater from diked areas is drained into a storm drain or into an open watercourse, lake, or pond, and bypasses the water treatment system. The bypass valve must normally be sealed in closed position and opened and resealed following drainage under responsible supervision. Records are maintained with the SPCC Plan at the Ridgeview field office.

Date

Area

Presence of Oil

Time Started

Time Finished

Signature

12/5/2003

Tank battery

No oil

08:00

8:40

William Mackenzie