Clearwater Oil Company, Ltd.

Big Bear Lease No. 2 Production Facility

SAMPLE Spill Prevention, Control, and

Countermeasure (SPCC) Plan

Manager of Field Operations must provide the following information to the U.S. Environmental Protection Agency’s Regional Administrator within 60 days:

Name of the facility;

Name of the owner or operator;

Location of the facility;

Maximum storage or handling capacity and normal daily throughput;

Corrective actions and countermeasures taken, including a description of equipment repairs and replacements;

Description of facility, including maps, flow diagrams, and topographical maps;

Cause of the discharge(s) to navigable waters, including a failure analysis of the system and subsystems in which the failure occurred;

Additional preventive measures taken or contemplated to minimize possibility of recurrence; and

Other pertinent information requested by the Regional Administrator.