X hits on this document

107 views

0 shares

0 downloads

0 comments

6 / 45

Clearwater Oil Company, Ltd.

Big Bear Lease No. 2 Production Facility

SAMPLE Spill Prevention, Control, and

Countermeasure (SPCC) Plan

Introduction

The purpose of this Spill Prevention Control and Countermeasure (SPCC) Plan is to describe measures implemented by Clearwater to prevent oil discharges from occurring, and to prepare Clearwater to respond in a safe, effective, and timely manner to mitigate the impacts of a discharge from the Big Bear Lease No. 2 production facility.  This SPCC Plan has been prepared and implemented in accordance with the SPCC requirements contained in 40 CFR part 112.

In addition to fulfilling requirements of 40 CFR part 112, this SPCC Plan is used as a reference for oil storage information and testing records, as a tool to communicate practices on preventing and responding to discharges with Clearwater employees and contractors, as a guide on facility inspections, and as a resource during emergency response.

-X-

Version 1.0, 11/28/2005

Document info
Document views107
Page views107
Page last viewedWed Dec 07 22:19:13 UTC 2016
Pages45
Paragraphs1416
Words11860

Comments