X hits on this document

125 views

0 shares

0 downloads

0 comments

9 / 45

Clearwater Oil Company, Ltd.

Big Bear Lease No. 2 Production Facility

SAMPLE Spill Prevention, Control, and

Countermeasure (SPCC) Plan

Plan Review

40 CFR 112.5

In accordance with 40 CFR 112.5, Clearwater Oil periodically reviews and evaluates this SPCC Plan for any change in the facility design, construction, operation, or maintenance that materially affects the facility’s potential for an oil discharge.  Clearwater reviews this SPCC Plan at least once every five years.  Revisions to the Plan, if any are needed, are made within six months of this five-year review.  Clearwater will implement any amendment as soon as possible, but not later than six months following preparation of any amendment. A registered PE certifies any technical amendment to the Plan, as described above, in accordance with 40 CFR 112.3(d).

Scheduled five-year reviews and Plan amendments are recorded in Table 0-1. This log must be completed even if no amendment is made to the Plan. Unless a technical or administrative change prompts an earlier review, the next scheduled review of this Plan must occur by November 23, 2008.

Table 0-1: Record of Plan Review and Changes

Date

Authorized Individual

Review Type

PE Certification

Summary of Changes

11/23/03

Bill Laurier

Initial Plan

Yes

N/A

04/14/04

Bill Laurier

Off-cycle review

No

Changed telephone number for Field Operations Manager.  

Corrected page numbers in Table of Content.

Non-technical amendments, no PE certification is needed.

Location of SPCC Plan

40 CFR 112.3(e)

In accordance with 40 CFR 112.3(e), and because the facility is normally unmanned, a complete copy of this SPCC is maintained at the field office closest to the facility, which is located approximately 25 miles from the facility at 2451 Mountain Drive, Ridgeview, LA. Additional copies are available at the Clearwater Oil Company management office, located at 13000 Main Street, Suite 400, Houston, TX.

-X-

Version 1.0, 11/28/2005

Document info
Document views125
Page views125
Page last viewedSun Dec 11 00:45:57 UTC 2016
Pages45
Paragraphs1416
Words11860

Comments