X hits on this document

226 views

0 shares

0 downloads

0 comments

24 / 84

CITY OF BLAINE 2010 FEE SCHEDULE

9. Set fee for residential demolition permit

  • 10.

    Set fee for residential moving permit

  • 11.

    Set fee for residential window replacement

  • 12.

    Set fee for swimming pools

    • -

      Above ground

    • -

      In ground

  • *

    Or the total hourly cost to the jurisdiction, whichever is the greatest.

This cost shall include supervision, overhead, equipment, hourly wages, and fringe benefits of the employees involved. ** Actual costs include administrative and overhead costs. Plan Review Fees: When submittal documents are required by Section 106.3.2, a plan review fee shall be paid at the time of permit issuance. Said plan review fee shall be 65 percent of the building permit fee shown above.

The plan review fees specified in this subsection are separate fees from the permit fees specified in Section 107.2 and are in addition to the permit fees.

$75.00 plus $2,000 escrow cleanup fee

  • +

    state surcharge

.50¢ $75.00 plus $2,000 escrow cleanup fee

  • +

    state surcharge

.50¢ $30.00

/window

with a maximum of $150.00 + state surcharge .50¢

$60.00 + 50¢ state surcharge $100.00 + 50¢ state surcharge

construction Top landing ramp not to exceed 36 square feet in area Construction requirements to conform to MN State Building Code

requirements Compliance with all zoning regulations required

When submittal documents are incomplete or changed so as to require additional plan review or when the project involves deferred submittal items as defined in Section 106.3.4.2, an additional plan review fee shall be charged at the rate shown above. Fee Exception: Private residential handicap ramps are exempt from the permit fee

required

prior

to

requirement subject to the following criteria:

  • Plan submittal review and normal permit

approval

18-74 18-125 18-125/161

Certificate of occupancy Contractor’s license Heating, ventilating, air conditioning:

$10.00 $35.00

Mechanical warm air system (new residential construction)

Hot water system (includes burner) Ventilating systems Commercial mechanical – all

$90.00 $60.00 $60.00 Based on 3% of job

P:\Agendas\Council_EDA_Workshop\2010\04-01-10\09. Public Hearings\Ord. 10-2201 Revised Fee schedule.doc Last printed March 25, 2010 9:06:00 AM

Page 3 of 11

Document info
Document views226
Page views226
Page last viewedWed Dec 07 09:39:01 UTC 2016
Pages84
Paragraphs1812
Words15316

Comments