X hits on this document

241 views

0 shares

0 downloads

0 comments

40 / 89

128.

Status of proposed/under implementation PPP projects are given in the following table:-

Name

of Project Details

Present Status

Department/ Work UPEIDA

Yamuna Expressway Construction

08-Lane Access Controlled Expressway from Greater Noida to Ballia

08-Lane Access Controlled Expressway on the Right Bank of Upper Ganga Canal from Eastern Peripheral Expressway near Dehra to Uttar Pradesh

  • -

    Uttarakhand border (10 km. before the border)

Jhansi-Kanpur-Lucknow-Gorakhpur to Kushinagar 08-Lane Access Controlled Expressway Agra to Kanpur 08-Lane Access Controlled Expressway Lucknow - Barabank- NanparaLink Expressway

Kotdwar-Bijnor-Moradabad to Fatehgarh 08-Lane Access Controlled Expressway Bijnor (10 km. before Uttarakhand border) to Narora 08-Lane Access Controlled Expressway Noida to Agra-165 Km. long

Concession Agreemen 23.03.2008. Applied Environment Clerance LOI placed with the t

signed on

for

Pre-

consultant.

Agreement to be executed within a week time.

TOR for consultant selection is being prepared. TOR for consultant selection is being prepared. TOR for consultant selection is being prepared. TOR for consultant selection is being prepared. TOR for consultant selection is being prepared. Physical Progress is 29.27% against the target of 23.48%.

Uttar Pradesh Upgradation/maintenance of State highways

State Highways Authority

Lucknow -Raibareilly-Sultanpur-Azamgarh- Balia Delhi-Saharanpur-Yamunotri Road Bareilly- Almora- Bagheshwar

The work of feasibility study is in progress.

Varanasi-Shaktinagar Tanda-Jaunpur-Mirzapur-Dudhi Road Badaun-Bils-Islamnagar-Bahjoi-Sambhal- Hasanpur-Gajraula Road

Power

129.

Power is the engine of growth of any developing economy. Consumption of electrical energy is a

universally accepted indicator of progress in the agricultural, industrial and commercial sectors, as also of

the well being of the people of the State. No major economic activity can be sustained without adequate and reliable supply of power. It plays a critical role in employment generation, regional development and poverty eradication.

[ 401 ]

Document info
Document views241
Page views241
Page last viewedSat Dec 03 14:29:57 UTC 2016
Pages89
Paragraphs4334
Words33274

Comments