c.Pinnacle Design/Build Group, Inc., in the amount of $208,638 for design, installation, and maintenance manual for gabion structures for use in district construction projects.

2.Recommendation that awards be made to:

a.Rozco Contracting, Inc., for street closure and utility abandonment for Bretshire regional detention basin, Unit P518-04-00 in Precinct 2 in the amount of $195,755.

b.Serco Construction Group, Ltd., for sediment removal from Prince Creek Drive to Westgreen Boulevard in Precinct 3 in the amount of $322,793.

c.Serco Construction Group, Ltd., for general repairs in the Clear Creek watershed in Precinct 2 in the amount of $1,105,560.

3.Recommendation that the court approve contracts and bonds for:

a.Rozco Contracting, Inc., for channel restoration from P100-00-00 to Aldine-Bender Road in Precinct 1 in the amount of $785,550.

b.Serco Construction Group, Ltd., for the Brays Bayou federal flood control project, Arthur Storey Park detention facilities, Compartments 3 and 4, Phase 7, Discrete Segment 22 in Precinct 3 in the amount of $2,759,475.

c.Texas Sterling Construction, LP, for projects Z100-00-00-X098 and Z100-00-00-X102 in Precincts 3 and 4 in amounts of $464,262 and $377,761.

4.Recommendation for approval of construction documents and authorization to seek bids for a three-week bid period for:

a.Concrete repairs on Brays Bayou in Precinct 1 at an estimated cost of $906,000.

b.General repairs in the Addicks Reservoir watershed in Precinct 3 at an estimated cost of $574,000.

c.General repairs in Precincts 1 and 2 at an estimated cost of $580,000.

d.Detention facilities, channel modifications, and discrete segment 21 for Brays Bayou from Old Westheimer to Eldridge for the Brays Bayou federal flood control project at an estimated cost of $2.3 million.

e.Regional detention basin, Phase 1 improvements for Greens Bayou at the confluence of Garners Bayou in Precinct 4 at an estimated cost of $5.2 million.

5.Recommendation for authorization to seek bids through the Purchasing Agent to control the feral hog population at the Greens Bayou wetlands mitigation bank in Precinct 4 at an estimated cost of $32,500.

6.Recommendation for authorization to close the project for channel rehabilitation and realignment of Unit P118-19-00 from Orange Grove Drive to Unit P118-19-04 in Precinct 1.

7.Recommendation that Unit U500-05-00 in Precinct 3 be added to the district's stormwater management system for identification purposes only for Addicks Reservoir.