05.16.06

Page -8-

e.Statewide Traffic Signal Co., contractor for traffic signal installation and roadway improvements at the intersections of Longenbaugh Drive and Queenston Boulevard and at Park Row and Foxlake Drive in Precinct 3, adding 87 calendar days and resulting in an addition of $463 to the contract amount (050109-2).

f.TJ&T Enterprise, contractor for Grant Road clearing from Jones Road to Lakewood Forest Drive in Precinct 3, resulting in a reduction of $13,267 from the contract amount (050275-2).

g.Lecon, Inc., contractor for erosion repair for Lexington Woods outfall ditch in Precinct 4, adding eight calendar days and resulting in no change to the contract amount (040203-3).

h.Texas Sterling Construction, contractor for Spring-Cypress Road, Section Four in Precinct 4, adding nine calendar days and resulting in a reduction of $128,176 from the contract amount (030478-3).

5.Recommendation for authorization for the County Judge to execute architectural/engineering/environmental services agreements or amendments with:

a.Clark Condon Associates, Inc., in the amount of $94,940 in connection with design of graphic signage and landscape improvements along the Crosby Lynchburg/SH 134 corridor in Precinct 2.

b.Corrigan Consulting, Inc., in the amount of $96,309 in connection with remediation of contaminated soils at the Pasadena Courthouse Annex at Richey Road and SH 225 in Precinct 2.

c.Klotz Associates, Inc., in the additional amount of $49,650 for construction of Mayde Creek pedestrian and bicycle facility from the Cullen Park pedestrian and bicycle facility to west of Keyhole Lane in Precinct 3.

d.Binkley & Barfield, Inc., in the amount of $154,158 in connection with construction of Cutten Road from south of FM 1960 to the north end of the north approach slab of the proposed bridge over Greens Bayou in Precinct 4.

e.LJA Engineering & Surveying, Inc., in the amount of $65,000 in connection with construction of a hike and bike trail within the Spring Creek Greenway project between Jesse H. Jones Park and Pundt Park in Precinct 4.

f.Van DeWiele Engineering, Inc., in the amount of $117,535 in connection with construction of Aldine-Westfield Road from Hydro-55 Street to south of Farrell Road in Precinct 4.

6.Recommendation for deposit of funds received from:

a.City of La Porte in the amount of $241,804 for final accounting for Canada Road from Spencer Highway to Fairmont Parkway in Precinct 2.

b.290 Residential, Ltd., in the amount of $37,184 for traffic signals at the intersection of Fry Road and Mound Road in Precinct 3.

7.Recommendation for authorization to negotiate with:

a.Carter and Burgess, Inc., for environmental services for Spring Creek Greenway between Pundt Park and Jesse Jones Park in Precinct 4.