Stallion Hill Water Storage Tank:

  • Replace coliform sampling piping

  • Storage tank refurbished with new interior\exterior coatings and repaired

structural issues

  • Inspected and maintained the entire perimeter fencing and gates to ensure complete area and storage tank security. Clean and maintain grounds including cutting brush in & around the facility fencing.

St Anne’s Water Storage Tank:

  • Power wash lower exterior of tank

  • Inspected and maintained the entire perimeter fencing and gates to ensure complete area and storage tank security. Clean and maintain grounds including cutting brush in & around the facility fencing.

Wells #1, 3, 5:

  • Installed new time delay for Well #1 startup to meet with chlorine requirements

  • Replace packing for Well #1 pump

  • Rebuild auto prime valves to prevent gas lock of hypochlorite pumps

  • Replace blown head gasket and water pump to Well #3 auxiliary power unit

  • Repair PVC piping at Well #1 Sodium Hypochlorite tank

  • Replace Sodium Hypochlorite injector for Well #5

  • Repair Sodium Hypochlorite metering pump for Well #1

  • Replace Sodium Hypochlorite injector for Well #3 including PVC piping

  • Re-plumb sample taps in Well #1

  • Rebuilt the Well chlorine feed pumps four times during the year

  • Tested and calibrated the flow metering equipment at all Wells

Distribution System:

  • New water main installed on Rt. 131 from Hall Rd. to the Southbridge line

  • Exercised and flushed all water hydrant twice during the year

  • Data log pressures at key points in the system

  • Read and recorded water meters quarterly

  • Restored all fire hydrants as needed during the year

  • Winterize and install locator flags on all hydrants

  • Rebuilt and tested all water hydrant bleeders