6. Replaced a 12” butterfly control valve with a 12” gate valve at the Stallion Hill Water Tank found faulty during the tank rehabilitation project.

    • 7.

      Recycled 2,212 cubic yards of road material through a rental crusher at the D.P.W. yard.

  • 6.

    General Road Maintenance:

Grading all gravel roads (13+ miles), brush cutting (51+ miles) and street sweeping (74 + miles) were completed during this construction season.

In closing, for the first time in awhile the Department’s staffing has not changed. Thank you for your continued support.

Respectfully submitted,

Gregory Morse D.P.W. Director