X hits on this document

676 views

0 shares

0 downloads

0 comments

91 / 257

6. Replaced a 12” butterfly control valve with a 12” gate valve at the Stallion Hill Water Tank found faulty during the tank rehabilitation project.

    • 7.

      Recycled 2,212 cubic yards of road material through a rental crusher at the D.P.W. yard.

  • 6.

    General Road Maintenance:

Grading all gravel roads (13+ miles), brush cutting (51+ miles) and street sweeping (74 + miles) were completed during this construction season.

In closing, for the first time in awhile the Department’s staffing has not changed. Thank you for your continued support.

Respectfully submitted,

Gregory Morse D.P.W. Director

91

Document info
Document views676
Page views676
Page last viewedFri Dec 09 17:59:19 UTC 2016
Pages257
Paragraphs8163
Words76007

Comments