DRYER VENT

Vent the dryer directly to the outside and install an exterior cap. Use rigid aluminum piping with all

joints properly secured.

906

BOILER

Remove old boiler and haul from job site. Install high efficiency, 85% plus AFUE gas boiler. Heating

Systems shall be rooms and other

designed and balanced or adjusted spaces with a heating capacity to

to provide for the distribution of heat to all habitable

maintain a temperature of at least

68° F when the

temperature is -10° F. Contractors shall be responsible for any new gas line for this installation. All equipment shall be installed in accordance with Mechanical Code as approved by the City of Cedar Rapids and inspected by

or electrical wiring required the most currently adopted a City Mechanical Inspector

prior to acceptance.

1000 PLUMBING

1001

SEWER/WATER LINE REPLACEMENT

Install a new 1" water supply line from the house to the stopbox or sewer line from house to City main. Secure all required permits. Include a survey to determine the full extent of work including depth of excavation, replacement of paving and sidewalk and all new lines required. Make minimum cut for required excavation, including replacement of all material damaged or removed in the process of sewer/water line replacement. Replacement or patching material shall match existing finish/quality. All work shall comply with all applicable codes. Back fill with clean fill dirt, free from stones or concrete.

Tamp each 10" layer. Finish grade and seed as applicable.

1002

WATER HEATER

Disconnect old hot water heater and haul from job site. Install a new 40-gallon gas-fired or electric, standard efficiency hot water heater, AUI type, glass lined. Must be UPC approved with at least a 5-yr Warranty on the tank and a one-year warrant on the gas valve. Gas water heater (up to 60 gallons) shall have ≥0.62 EF (energy factor) and electric water heater ≥0.93 EF. Direct-fired heaters shall be provided with a pressure and temperature relief valve. Include a lever gas shut off valve on the gas line. Heater to

be vented and the flue to be of sufficient height to have proper draft.

1002a. Pressure Relief Valve: Install a pressure-temperature relief valve on the water heater - 150 lb. Pressure and 210 degrees. Use ¾" inlet and outlet pipes for relief valve.

1002b. Discharge Pipe: Install a discharge pipe on the water heater. Use ¾" copper or galvanized pipe within 6" of floor.

1003

GAS PIPING

Install piping and a lever handle gas shut off valve for a water heater, furnace, stove, dryer, or boiler.

1004

TOILET

Install a new stool. Remove existing fixtures from job site including all piping that cannot be reused when installing new work. Type to be vitreous china white, floor fastened, reinforce floor structurally for new fixtures as necessary with a minimum 1.6 gallons per flush or better. Install to code. Install a water

supply shut-off if none exists. Must be UPC approved. Quality and price to be mid-range.

\\citycr.local\sharedocs\PublicWorks\HSG\Housing Rehab\Specs-Codes\General Specifications.doc

20

Document info
Document views64
Page views64
Page last viewedTue Dec 06 15:40:26 UTC 2016
Pages27
Paragraphs935
Words10325

Comments