CONFIGURATION INFORMATION

Page 20 of 74

Tested Storage Configuration (TSC) Description Clause 9.4.3.5.2

The FDR must include sufficient information to recreate the logical representation of the TSC. In addition to customer tunable parameters and options (Clause 4.2.4.5.3), that information must include, at a minimum:

A diagram and/or description of the following:

¾

All physical components that comprise the TSC. Those components are also illustrated in the BC Configuration Diagram in Clause 9.2.4.4.1 and/or the Storage Network Configuration Diagram in Clause 9.2.4.4.2.

¾

The logical representation of the TSC, configured from the above components that will be presented to the Workload Generator.

x

x x

Listings of scripts used to create the logical representation of the TSC.

If scripts were not used, a description of the process used with sufficient detail to recreate the logical representation of the TSC.

“Appendix C: Tested Storage Configuration (TSC) Creation” on page 64 contains the detailed information that describes how to create and configure the logical TSC.

SPC-1 Workload Generator Storage Configuration Clause 9.4.3.5.3

The FDR must include all SPC-1 Workload Generator storage configuration commands and parameters.

The SPC-1 Workload Generator storage configuration commands and parameters for this measurement appear in “Appendix D: SPC-1 Workload Generator Storage Commands and Parameters” on page 71.

SPC BENCHMARK 1™ V1.12

FULL DISCLOSURE REPORT

Huawei Symantec Technologies Co., Ltd. Huawei Symantec Oceanspace™ S8100 (8-node)

Submission Identifier: A00099 Submitted for Review: NOVEMBER 11, 2010

Document info
Document views186
Page views186
Page last viewedSun Dec 04 20:39:33 UTC 2016
Pages74
Paragraphs6246
Words21133

Comments