X hits on this document

194 views

0 shares

0 downloads

0 comments

22 / 74

Technology Supplier

Proposed Facility Size

Site Size

Estimated Tipping Fee

ArrowBio (Anaerobic Digestion)

300 TPD 1050 TPD

4 acres 12 acres

$50/ton(1) $50/ton(1)

CWT (Chemical)

220 TPD 1000 TPD

3 acres 5.8 acres

$60/ton not provided

IES (Gasification)

125 TPD (prepared)

1 acre

$56/ton(1), (2)

LA County Phase II: Project Concepts by Technology Supplier (October 2007)

242 TPD (as received)

IWT (Gasification)

312 TPD 623 TPD 935 TPD

Ntech (Gasification)

413 TPD

3.5 acres

$131/ton

5 acres

$70/ton

8 acres

$59/ton

3.5 acres

$55/ton(1)

22

(1) Integrated pricing with MRF, considers use of existing scales, roads and site infrastructure at MRF.

(2) Assumes waste feedstock is preprocessed by MRF to 2” in size, glass, metal removed.

Document info
Document views194
Page views194
Page last viewedFri Dec 09 07:45:40 UTC 2016
Pages74
Paragraphs1024
Words3324

Comments