X hits on this document

66 views

0 shares

0 downloads

0 comments

11 / 16

June 2006

TITLE________________________________PROJECT NO.

LOCATION___________________________________DATE

REVIEWED BY

ORGANIZATION

DESIGN DEVELOPMENT 1 (DD1)

HEATING, VENTILATING, AND AIR CONDITIONING

NO.

ITEM

COMMENTS/

YES/NO/N/A

2

(cont.)

p.Provide schematics, flow and riser diagrams, control diagrams and control devices for each type of air handling and hydronic system.

q.Investigate use of existing Engineering Control Center (ECC), if any.

3

Check compliance by the designer requirements stated in the applicable VA, HVAC Design Manual.

4

Check smoke and fire protection, and other life safety provisions in the design:

5

Compliance with VA National CAD Standard Application Guide and applicable National CAD Standard modules.

11

Document info
Document views66
Page views66
Page last viewedTue Jan 24 05:20:51 UTC 2017
Pages16
Paragraphs452
Words2924

Comments