X hits on this document

43 views

0 shares

0 downloads

0 comments

16 / 16

June 2006

A/E CHECKLIST

TITLE________________________________PROJECT NO.

LOCATION___________________________________DATE

REVIEWED BY

ORGANIZATION

FINAL BID DOCUMENTS

HEATING, VENTILATING, AND AIR CONDITIONING REVIEW

NO.

ITEM

COMMENTS/

YES/NO/NA

1

Check if the A/E submission is in compliance with PG-18-15.

2

Summary of PG-18-15 A/E submission requirements for the designers:

a.Place the seal of the professional engineer responsible for the design on the drawings.

b.Submit revised draft specifications to incorporate all changes, resolution of conflicts and modifications noted at CD1 review. Revisions shall also include results of any drawing changes not shown on CD1 documents that affect the specifications.

c.Type specifications in final format and submit a complete set for review. Include a set of full size final drawings fully coordinated.

d.Return all draft specifications reviewed at CD 1 review to aid the final bid documents review.

3

Compliance with VA National CAD Standard Application Guide and applicable National CAD Standard modules.

16

Document info
Document views43
Page views43
Page last viewedSat Dec 03 23:21:25 UTC 2016
Pages16
Paragraphs452
Words2924

Comments