X hits on this document

44 views

0 shares

0 downloads

0 comments

8 / 16

June 2006

A/E CHECKLIST

TITLE________________________________PROJECT NO.

LOCATION___________________________________DATE

REVIEWED BY

ORGANIZATION

SCHEMATIC 1 (S1)

HEATING, VENTILATING, AND AIR CONDITIONING REVIEW

NO.

ITEM

COMMENTS/

YES/NO/NA

1

Check if the A/E submission is in compliance with PG-18-15.

2

Summary of PG-18-15 A/E submission requirements for the designers:

a.Provide estimated heating and cooling loads based on floor area.

b.Coordinate estimated preliminary steam demand with steam generation designer.

c.Investigate condition and available capacity of existing utilities.

d.Provide description of tentative zoning.

e.Select three different applicable systems for life cycle cost analysis.

f.Provide a list of energy conservation measures to be used in design, and life cycle cost analysis.

3

Check compliance by the designer, requirements stated in the applicable VA, HVAC Design Manual.

4.

Compliance with VA National CAD Standard Application Guide and applicable National CAD Standard modules.

8

Document info
Document views44
Page views44
Page last viewedSun Dec 04 10:22:12 UTC 2016
Pages16
Paragraphs452
Words2924

Comments