A/E CHECKLIST

TITLE________________________________PROJECT NO.

LOCATION___________________________________DATE

REVIEWED BY

ORGANIZATION

SCHEMATIC 2 (S2)

HEATING, VENTILATING, AND AIR CONDITIONING REVIEW

NO.

ITEM

COMMENTS/

YES/NO/NA

1

Check if the A/E submission is in compliance with PG-18-15.

2

Summary of PG-18-15 A/E submission requirements for the designers:

a.Provide description of HVAC systems and equipment for each functional space.

b.Provide complete life cycle cost analysis with specific recommendations and full back-up data.

c.Provide heating and cooling capacities of each functional area, and bloc loads for each building.

d.Indicate tentative locations and sizes of all mechanical equipment rooms, and main shafts.

e.Show block layouts of major pieces of equipment.

f.Resolve locations of louvers. Outside air intake louvers must be away from loading dock and truck waiting areas, and emergency generator exhaust etc.

3

Check compliance by the designer, requirements stated in the applicable VA, HVAC Design Manual.

4

Compliance with VA National CAD Standard Application Guide and applicable National CAD Standard modules.