X hits on this document

163 views

0 shares

0 downloads

0 comments

29 / 45

TOYOTA Procedure

Fig 18-6

Fig 18-7

Issue: B

10/20/07

FJ CRUISER

Remove

MY – 2007-

SUPERCHARGER FIT KIT

(d) Reinstall the hood lock assembly (Fig 18-6). Torque: 8 Nm (71 in lbf)

(e) Reinstall the temperature sensor to the new hood latch bracket (Fig 18-6).

(f) Trim the plastic hood lock release lever protector as shown (Fig 18-7).

(g) Reinstall the hood lock release lever protector (Fig 18-8).

Fig 18-8

(h) Re-mount the horn with the spacer (A7), M8X30 mm bolt (A8) as shown (Fig 18-9). Note: This is to space the horn out away from the LTR. Torque: 9.8 Nm (7 ft lbf) Reconnect the electrical connector to the horn.

Fig 18-9

Page 29 of 45 pages

Document info
Document views163
Page views164
Page last viewedWed Dec 07 11:25:58 UTC 2016
Pages45
Paragraphs1344
Words8482

Comments