X hits on this document

202 views

0 shares

0 downloads

0 comments

30 / 45

TOYOTA Procedure

Fig 19-1

Issue: B

10/20/07

FJ CRUISER

MY – 2007-

SUPERCHARGER FIT KIT

(i) After making sure the outlet on the pump points straight up, tighten the mounting bolts. Torque: 12 Nm (9 ft lbf)

Fig 18-10

(j) Slide a wide band spring clamp (H3) approximately 2” onto each end of the LTR to pump formed coolant hose (J5). Install this hose to the lower outlet on the LTR and the pump outlet and position each clamp to hold it in place (Fig 18-10).

  • 19.

    Installation of the Intercooler Tank and Hoses.

    • (a)

      There are 2 holes in the lifting bracket for the brake master cylinder (Fig 19-1). The will be used to mount the intercooler coolant reservoir. The forward most of the two holes has an M6 weld nut attached to the lifting bracket.

(b) Using 2 M6x20 bolts (A4) and 1 M6 nut (A5), mount the intercooler reservoir bracket (A2) to the 2 holes in the lifting bracket (Fig 19-2). Torque: 5.5 Nm (49 in lbf)

Fig 19-2

FOR MANUAL TRANSMISSIONS

(c) On the driver’s side inner fender panel, there is a reinforcing plate to which the clutch reservoir is attached. Remove the M8 bolt shown (Fig 19-3).

Fig 19-3

Page 30 of 45 pages

Document info
Document views202
Page views203
Page last viewedThu Jan 19 13:15:36 UTC 2017
Pages45
Paragraphs1344
Words8482

Comments