X hits on this document

178 views

0 shares

0 downloads

0 comments

34 / 45

TOYOTA Procedure

Fig 19-16

Issue: B

10/20/07

FJ CRUISER

4” X 36” Hose

Cut & discard end of hose.

MY – 2007-

SUPERCHARGER FIT KIT

(t) Route the hose across the firewall, behind the brake master cylinder (Fig 19-16), and along side the earlier hose, on through the bulkhead opening, and connect it to the upper nipple on the LTR. After trimming it to length, secure it with a wide band spring clamp (Fig 19-17).

Fig 19-17

(u) Trim the short end of the 4” x 36” molded hose (J2) as shown (Fig 19-18). Slide the Unicoil hose shaper (A9) onto the hose and then slide a wide band spring clamp (H3) approximately 2” onto the short leg of the ¾hose and a screw clamp (H6) onto the other end.

Fig 19-18

(v) Attach the short leg of the molded hose end to the driver side intercooler fitting on the supercharger housing top cover (Fig 19-19). Secure it with the wide band spring clamp (H3).

Fig 19-19

Page 34 of 45 pages

Document info
Document views178
Page views179
Page last viewedSun Dec 11 00:27:57 UTC 2016
Pages45
Paragraphs1344
Words8482

Comments